Special assets Infrastructure Transport infrastructure


Information on the "Special Infrastructure Fund" project in the Salzland district can be found here:
The measure is located on the open stretch between the end of Atzendorf and the village of Lust. The road surface needs to be upgraded as there is a lot of damage to the asphalt and concrete surfaces. The section to be upgraded is approx. 3,500 metres and is expected to be upgraded in two construction phases.
1st construction phase: Atzendorf to Kalkteiche
2nd construction phase: Lime ponds to Lust
In planning