Display removal of an installation
Service description
You must notify the lower building supervisory authority in advance if you wish to remove a structure.
This applies to disposal that does not require a procedure.
You may dispose of the following installations without having to follow the procedure:
- Installations in accordance with Section 60 (1) BauO LSA (for example: smaller garages, masts or walls)
- Detached buildings of building classes 1 and 3
- and other installations that are not buildings with a height of up to 10 metres.
You can start removing the installation one month after your notification if the building supervisory authority does not take any building supervisory measures.
If you only want to remove part of a building project, this is a change to a building structure. You will need a building permit for this.
The following applies to non-detached buildings: You must have the stability of the building or buildings to which the building to be removed is attached checked. The inspection must be carried out by a qualified structural engineer. The removal must then be monitored. This does not apply if the building is attached to a building that is not subject to a procedure.
Procedure
You can report the removal of an installation online or in writing.
Proceed as follows to submit an advert in text form using the form:
- Please fill in the form.
- Attach the required documents.
- Submit the notification to the responsible lower building supervisory authority.
- The lower building supervisory authority accepts the notification and proof from the qualified structural engineer and checks that they are complete.
- If documents are missing or if there are other ambiguities, you will be asked to submit the missing documents or to clarify the ambiguities.
- In this case, submit the missing or amended documents or the clarification.
- The lower building supervisory authority will check your notification
- If you have not heard back after one month, your report has been accepted and you can start the removal process.
Who should I contact?
Lower building supervisory authority
Which documents are required?
- Advertisement (digital or written)
- for non-detached buildings:
- Proof of stability and
- Confirmation of stability from a qualified structural engineer
What fees are incurred?
The advert is free of charge. There are no charges for this.
What deadlines do I have to observe?
You must notify the removal at least 1 month in advance.
Legal basis
Further information
- Information from the Ministry of Infrastructure and Digital Affairs - Planning permission
When planning and authorising a building project, a number of building regulations and planning regulations must be observed.
- Overview of public building law
- Overview of the building supervisory authorities in Saxony-Anhalt
You can find the building supervisory authority responsible for your building project here:
- Information from the Ministry of Infrastructure and Digital Affairs - Planning permission